2010 Restoration Project 
Additional Carpentry 
2 & 4 Arnold Drive, 8, 9, 10, 11, 12 & 14 Russell Drive and 1, 2, 3, 4, & 5 Stillwell Drive.    
Base Carpentry Contract for Russell  $20,000.00
Proposed Additional Work: Inspected 
(Mark&Jen)
Sent to Board  Board Approved 
8A Russell  lower left side corner; replace bad
OSB Board; flash & install new
clapboards
$950.00 x 4/29 4/29
8A Russell  front frame; repace 4x4 frame $750.00 x 4/29 4/29
8A Russell  deck connection $1,200.00 x 4/29 4/29
8D Russell  front frame; clalpboards; sheathing; trim  $1,400.00 x 4/30 5/3/2010
9A Russell  front entrance' 10x5 area; sheathing;
clapboards; trim; tyvek 
$1,500.00 x 5/10 5/11/10
9A Russell  right side of slider; 4x7 area; sheathing;
insulation; tyvek; clapboards; trim 
$1,200.00 x 5/7/10 5/7/2010
9A Russell  1st fl to middle of 2nd; dry rot; sheathing;
insulation
$5,800.00 x 6/1/10 6/1/2010
9D Russell  front window area; sheathing; tyvek; clapboards $1,100.00 x 5/6/2010 5/7/10
9D Russell  front left side; 10x20; sheathing; tyvek; 
clapboards; trim 
$3,200.00 x 5/10 5/11/10
9D Russell  deck connection; sheathing under deck;
tyvek; clapboards 
$1,600.00 x 5/10 5/11/10
9A Russell (gable) replace clapboards; 64 sq ft of sheathing; tyvek; new clapboards,    new window trim  $9,800.00 x 5/7/10 5/7/2010
9A &B Russell  front' 25x10; strip; clapboards; tyvek; trim;  $2,800.00 x 5/10 5/11/10
9B Russell  rear; left of slider; 3x10; clapboards, sheathing;
trim; tyvek
$1,200.00 x 5/7/10 5/7/2010
9B Russell  front corner; 2x10 area; sheathing;
clapboards; trim 
$675.00 x 5/7/2010 5/7/2010
9D Russell  gable; lower corner; 1st floor sill, plywood;
insulation; framing 
$4,600.00 x 5/24/2010 5/24/2010
10A Russell  rt side gable; 2nd fl; trim, clapboards; flash & tyvek  $3,600.00 x 5/6/10 5/7/10
10A Russell  front near entry; sheathing; clapboards  $1,400.00 x 4/30 5/3/2010
10A Russell  rear; remove 20 ft section that is not
working properly; re-install new
section; replace rotted facia & trim 
$1,800.00 x 5/7/10 5/7/2010
10D Russell  deck connection; reframe; sheathing;
flashing; clapboards; trim 
$1,200.00 x 4/30 5/31/2010
11A Russell  gable; 20x30 area; strip; tyvek; trim; clapboards $6,500.00 x 5/20/10 5/20/10
11A & B Russell front; 10x25; strip; tyvek; clapboards; trim,
sheathing
$2,800.00 x 5/18 5/19/10
11B Russell  front right; 4x15; sheathing; tyvek; clapboards; trim  $1,450.00 x 5/10 5/11/10
11B Russell  rear; 10x4; sheathing; clapboards; trim; tyvek  $1,650.00 x 5/10 5/11/10
11C & D Russell  front wall; 10x25; strip; tyvek; clapboards; trim $2,500.00 x 5/18 5/19/10
11D Russell  deck connection; soffit replacement  $1,400.00 x 5/7/2010 5/7/2010
11D Russell  15x10; sheathing; insulation; clapboards & trim $2,500.00 x 5/10 5/11/10
11D Russell  left front; 4x12; frame; clapboards; trim  $1,600.00 x 5/10 5/11/10
11D Russell  front corner; sheathing; clapboards; trim $850.00 x 5/7/2010 5/7/2010
12A Russell  front right side corner; 6x6; clapboard; trim  $950.00 x 5/6/2010 5/7/2010
12A & B Russell  rearwall; 25x10 clapboard replacement; deck connection @ A; entry way at A $4,600.00 x 5/20/10 5/20/10
12B Russell  front near gutter; 15x5 area; framing;
trim; clapboards; 
$2,400.00 x 5/18 5/19/10
12C&D Russell 20x10 back wall; clapboards; trim;
fascia behind gutter; replace gutter 
$3,400.00 x 5/18 5/19/10
12D Russell  right side lower corner; new sheathing;
clapboards 15x10; deck connection; 
$3,600.00 x 5/18 5/19/10
14A Russell  front right corner; 7 x 6 area; sheathing;
clapboards; trim 
$1,100.00 x 5/5/10 5/5/2010
14B Russell  deck connection; no clapboards  $950.00 x 5/5/10 5/5/2010
14B Russell  rear inside corner wall; 2x5 area; sheathing;
clapboards
$550.00 x 5/5/10 5/5/2010
14C Russell  rear; 1x7 sheathing; clapboards  $575.00 x 5/6/10 5/7/2010
14C Russell  rear; 2x11; clapboards, trim; left of slider  $950.00 x 5/6/10 5/7/2010
14D Russell  gable wall; 20x30 area; strip; tyvek; clapboards; trim $6,000.00 x 5/5/10 5/5/2010
14D Russell  front; 15x10 area; strip; tyvek; clapboards; trim  $1,800.00 x 5/7/10 5/7/2010
14D Russell  deck connection; rear corner; sheathing; clapboards; trim  $1,400.00 x 5/20/10 5/20/10
Russell Total:  $115,300.00
2A Arnold  door frame; 4x4 area $950.00 x 6/17/10
2A Arnold  right gable; 10x25; framing; sheathing; clapboards $6,200.00
2B Arnold  left corner; 7x2; sheathing; clapboards $1,200.00 x 6/17/10
2C & D Arnold back rear side of chimney; 7x7 area $1,100.00 x 6/17/10
2C Arnold  front & rear cheek wall ; 20X40 area; trim; clapboards $8,000.00
2C Arnold  front 11x2; trim; clapboards
4A&B Arnold  15x20; clapboards, trim, sheathing  $3,500.00
4B Arnold  front & rear cheek walls; clapboards; sheathing
20x40
$8,500.00
4C Arnold  left side of chimney; 2x7 area & sheathing  $650.00 x 6/17/10
4D Arnold  10x40 front; clapboards; trim $4,500.00
Arnold Total : $34,600.00
7A Griswold  total re-build with electrician  $27,467.00
7A Fillmore  total re-building  $16,100.00
$193,467.00